Manhattan Beach Studios marks the development and construction of the largest sound stage and movie studio campus facility in more than 50 years. The stages have been used over the last 14 years for television and movie production. The project consisted of two phases. Phase I consists of 11 sound stages (8 – 18,000 s.f. […]
Snyder Langston provided construction services for the core, shell and tenant build-out of the 34,000 s.f., four-story, structural steel-framed office building that was constructed on a small, tight site next to active sound stages. The 12-month construction schedule included demolition of the existing lot with live underground utilities. Parking is an open paved lot with […]
As the new home for Eastside Christian Church, this project houses a growing congregation, allowing them to serve God, build community and unleash compassion. Located on a 20-acre site in East Anaheim within the former Boeing / Autonetics development, the adaptive reuse included a 2,700-seat worship auditorium, along with classrooms, meeting rooms, a fellowship hall, […]
Pre-construction, design assistance, value engineering and general contracting services for the studio’s three phase project which includes the construction of two 18,000 s.f. and one 25,000 s.f. television recording sound stages, as well as a four-story, 80,000 s.f. steel framed office building counting dressing rooms, production support space and prop storage. The three new sound […]
Watson Laboratories, Inc., one of the largest pharmaceutical companies in the United States, turned to Snyder Langston for assistance in planning for company growth. The project involved repositioning more than 200,000 s.f. of existing building space. Watson Laboratories had an immediate need to expand their operations. The company was experiencing tremendous growth and simply needed […]
The Common Use Passenger Processing System [CUPPS] was a key project planned by John Wayne Airport (JWA) under its Airport Improvement Program. The CUPPS project is a centralized computer system, consisting of hardware, software, and network equipment and infrastructure. Virtual thin clients, printers, scanners, and associated equipment will be located at the gates and ticket […]
Emulex is the leading supplier of Fiber Channel host bus adapters – a technology for transmitting data between computer devices three times faster than the Small Computer System Interface (SCSI) commonly used today. Approximately 70% of the world’s leading network suppliers, like IBM, Dell and Hewlett-Packard, select Emulex products to enhance system connectivity. To keep […]
2012 3form 7th Annual People’s Choice Installation Contest Grand Prize Winner 6,000 s.f. renovation of an existing laboratory in the Beckman Behavioral Biology Building. As a design-build project, it involved coordination and planning with the client and professor in order to determine the architectural, structural, mechanical and code-required needs and develop them into a complete […]
Renovation of three existing laboratories (Blocks), in the Shepherd Research Building on the Allergan campus in Irvine, CA. The project consists of the complete renovation to the existing laboratory spaces, approximately 7,600 s.f., as well as the utilities, in order to accommodate new equipment and pharmaceutical testing needs.
General contracting services for a 70,000 s.f. tenant improvement for a validated manufacturing facility in an existing five-story office building. Work included Class 10,000 clean rooms, office space, a complete mechanical system upgrade, process piping installation and a new site mechanical yard. A warehouse was also constructed on the ground floor with a Vertical Reciprocating […]