Snyder Langston remodeled the sanctuary and the back-of-house rooms consisted of approximately 22,000 s.f. We completed the remodel in an eight-week period. The finishes were top of the line, and transformed the thirty-year-old church into a modern-day living space.
This 21,251 s.f. project includes a 750-seat sanctuary structure, including two levels with balcony seating, narthex, restrooms, women’s lounge, classrooms, choir preparation area and support provisions, library space, and meeting rooms. The site was challenged by existing facilities that were presently in use, which had to be removed to allow construction of the new facilities. […]
The Women’s Village was built to provide a safe haven for women seeking a permanent end to homelessness through employment. This $8-million, 35,892 s.f., mixed-use transitional housing project in downtown Los Angeles is situated on a half acre. Phase III includes 21 one-bedroom, 540 s.f. apartments and a two-bedroom, 750 s.f. manager’s unit. The project […]
As the new home for Eastside Christian Church, this project houses a growing congregation, allowing them to serve God, build community and unleash compassion. Located on a 20-acre site in East Anaheim within the former Boeing / Autonetics development, the adaptive reuse included a 2,700-seat worship auditorium, along with classrooms, meeting rooms, a fellowship hall, […]
Snyder Langston was selected by Chapman University to construct this 13,500 s.f. award-winning chapel. Wallace All-Faiths’ Chapel will include a main worship area, administrative offices, and a beautiful courtyard and garden featuring a luminous fountain. All design elements are in accordance with the standards established by the Old Town Historical Guidlelines of the City of […]
The overall project includes eight buildings totalling 93,250 s.f. located on an existing seven-acre parcel in Santa Ana, CA and was built in multiple phases. The Charter High School accommodates 480 students in a project-based learning STEM curriculum, with on-site living units for up to 80 students. Phase I was an interim campus plan which included […]
This project entailed the remodel of an existing one-story clinic building, the addition of a three-story building housing the new waiting area, laser-eye center and conference rooms. The focus of the project was to update the Eye Centers’ image as a “public friendly” facility where people could come for their optical needs. To accomplish this, […]
Work was performed on an active University site for this state-of-the-art Library for Loyola Marymount University in Los Angeles. The 120,000 s.f. Library is three-levels of structural steel building over a full basement clad in GFRC and glass. The new library will incorporate environmentally sensitive design elements and materials, in accordance with the LMU philosophy […]
6,000 s.f. renovation of an existing laboratory in the Beckman Behavioral Biology Building. As a design-build project, it involved coordination and planning with the client and professor in order to determine the architectural, structural, mechanical and code-required needs and develop them into a complete design package.
This 35,000 s.f., two-story educational facility is located on a 14-acre site adjacent to the H.G. “Dad” Miller Golf Course, the public course that Tiger Woods played during his younger years. The ground floor of the facility includes a 675 s.f. kitchen; a 3,175 s.f. student lounge; a 1,390 s.f. multimedia laboratory; and a 200-seat, […]