Mallinckrodt Medical

Mallinckrodt Medical

Renovation and repositioning of a 110,000 s.f. warehouse facility into an integrated facility for manufacturing and warehousing of biomedical products. The project features Class 100,000 and 10,000 clean rooms with a chilled water and condenser water system for the injection molding equipment; a separate chilled water system dedicated to the clean area air conditioning system, […]

Hybritech

A 65,000 s.f. biomedical laboratory built to develop monoclonal engineering technologies and products for San Diego’s first biotech firm. Scope included a central plant for HVAC, processed piping, de-ionized water and various freeze-dryers, as well as Class 10,000 and Class 1,000 clean rooms, animal vivarium, refrigeration rooms, administrative offices and support services areas.

Baxter Diagnostics, Inc.

30,000 s.f. renovation of existing laboratory facility including demolition and re-work of microbiology laboratories, HVAC systems, medical gas systems, administration offices, structural supports, BSL-3 containment laboratories, complete rebuild of existing HVAC systems, and the construction and installation of lunch and conference rooms. Contaminated materials investigation and abatement were performed during all phases of construction activities.

Alliance Pharmaceuticals | Phase I, II, & III

Three-phase tenant improvement totaling 49,000 s.f. of chemistry and biochemistry labs, a Class 1,000 clean room, a Class 10,000 pilot plant, several vivariums (some with isolation chambers), a cold room, and surgical suites. Scope of work also included executive offices for this company that manufactures artificial blood products.

Barlow Respiratory Hospital – Elevator Upgrade

New Elevator and Smoke Door

Replacement of elevators #1 & #2 cabs, cylinders, pumps, and associated equipment Modernization of elevator #3 cab, cylinder replacement, and replacement of elevator#3 control panel within the machine room.

Little Company of Mary – San Pedro Voluntary Seismic Improvements

post shorting and web stiffeners added to existing column

Seismic upgrades to this 5-story, 231-bed acute care hospital built in 1925. Work included reducing the overall floor plate size on each end of every floor in the entire Central Wing Tower increasing the seismic separation of the structure from 4 inches to 14 inches. Seismic joints were created in all MEP and FLS systems […]

Barlow Respiratory Hospital – Body Holding Room

body holding area

Interior demolition of lower-level storage and engineering room, and re-building a Body Holding Room, Soiled Scope Cleaning Room, Clean Scope Cleaning Room, associated MEP changes and upgrades, as well as ADA renovation of an existing restroom.

CHOC Children’s – Inpatient Pharmacy Build

Tenant Improvement build-out approximately 9,850 square feet, located on Lower Level of CHOC Children’s Bill Holmes Tower The project will include Compounding Pharmacy, Clinical Pharmacy, and Administration Pharmacy. The scope of work includes the design of a new mechanical dedicated AHU – P and associated exhaust ductwork that will serve the Compounding Pharmacy. The Non-Compounding […]

Olympia Medical Center – Voluntary Seismic Improvements

Voluntary Seismic upgrade of Building 2 East Wing Structural additions to mitigate deflection incompatibility and torsion irregularity deficiencies identified in the SB-1953 Seismic Evaluation Scope included strengthening concrete shear walls, columns, and deck with concrete and rebar enlargements, steel drag struts, steel column brackets, and FRP column wraps