Mitsubishi Materials USA

Mitsubishi Materials USA

Design management and general contracting services for the 52,000 s.f., single-story distribution warehouse. Straightforward shell and core concrete tilt-up, panelized roof; includes tenant improvements. Installation of 75-foot-long and 25-foot-high storage carousels and racking systems as part of tenant improvement.

St. Joseph Health

medical construction and design

Pre-construction and general contracting services on this approximately 200,000 s.f. tenant improvement project that relocated St. Joseph Health from Orange to an existing building in Irvine, California. The new space provides St. Joseph’s employees with some of today’s newest space solutions. The new improvements constructed in the St. Joseph space are also reflecting the trends […]

Main Street Medical Plaza

medical construction

Provided general contracting services for two, two-story medical office buildings totaling 80,000 s.f. and including a 3-1/2-level parking structure.

Cal Optima

The project consists of a complete tenant improvement demolition and new build-out of the CalOptima Headquarters building in Orange. The scope comprises 140,000 s.f. of space in a basement and six upper floors and includes computer room air conditioning units, a computer room FM-200 clean agent fire suppression system, access flooring, high-end millwork, operable partitions […]

St. Thomas Korean Catholic Church

Construction of a new sanctuary for the Korean Catholic congregation on a five-acre church campus. The 37 ft. high, 15,500 s.f. building features distinctive concave-shaped roof structure with sizeable chandelier light features and a large rustic alter with a baptismal and sloped foundation providing an amphitheater feel to the alter area. The worship area has […]

Temple Israel

Construction of a 17,500 s.f temporary parking lot adjacent to the school campus. The parking lot accommodates 36 standard spaces and 18 compact spaces. The project included such site improvements as landscaping, site walls and a storm water infiltration unit. The additional parking will help reduce the amount of congestion the current campus faces during […]

Santa Margarita Athletic Center

“This top of the line facility enhances the opportunities for all those who are blessed to be a part of the student body here,” Bishop Tod D. Brown said. Snyder Langston completed the three-story, 39,000 s.f. athletic building for the Diocese of Orange. It houses a 7,000 s.f. state-of-the-art fitness center and weight room, team […]

Santa Margarita Aquatics Center

Provided services for the six-acre project featuring a 3,312 s.f. concession building; the 2,178 s.f. pool equipment building; a 50-meter pool; and bleachers seating for 450. The construction is wood framed and CMU block, both plaster finished.

Mater Dei High School Aquatics Building

Snyder Langston was contracted to provide design-build construction services for this multi-purpose 3,200 s.f. aquatics locker, training and fund raising facility. Features include team locker and changing rooms, state-of-the-art scoreboard, pool equipment storage room, video training room, wireless academic study breakout room, coach’s office and food service facility. Snyder Langston was challenged with maximizing the […]

YMCA / Santa Ana School District

Joint project between the YMCA, Children & Families Commission, Segerstrom High School, the Segerstrom Family and the Van Cleve Foundation Trust, to provide a joint-use facility to service the community and students of Segerstrom High School. A portion of the project was under DSA oversight due to the joint-use with the high school.