DreamWorks Animation

DreamWorks Animation

Snyder Langston provided Pre-Construction, Design- Build and General Contracting services for DreamWorks Animation, one of the most admired family entertainment brands in the world. This project included a 25,000 s.f. tenant improvement of an animation studio located on the 2nd floor of a 25-story building. Snyder Langston’s scope of work included constructing walls and ceilings […]

Wellington Foods

Renovation of an existing 115,000 s.f. food manufacturing facility. The project involved coordinating an accelerated schedule with a sequenced move of existing process equipment from another facility still in production and retrofitting the warehouse production area to accommodate the existing equipment, as well as meet new FDA requirements.

Hotel Irvine

Considered an indie brand lifestyle hotel, the Hotel Irvine was previously the Hyatt Regency Irvine. Snyder Langston remodeled and upgraded the hotel’s interior ground floor public spaces, including registration lobby, pre-function areas, meeting rooms, ballrooms, lounges, restaurant and bar areas.

St. Joseph Health

Pre-construction and general contracting services on this approximately 200,000 s.f. tenant improvement project that relocated St. Joseph Health from Orange to an existing building in Irvine, California. The new space provides St. Joseph’s employees with some of today’s newest space solutions. The new improvements constructed in the St. Joseph space are also reflecting the trends […]

Pacific Life Headquarters

commercial office construction

The nine-story office building, completed in 13 months for Pacific Life Insurance Company’s Whole Life Division, is a steel-frame and pre-cast concrete paneled structure, clad in two distinct colors. The building architecture uses four difference glazing systems highlighting an exterior canopy, manufactured of sheet metal panels, which provides relief from the weather. The 1,500 s.f. […]

Pacific Communications

54,213 sf tenant improvement of the 2nd, 8th and 9th floors, including new walls, power, lighting and finishes.

Masimo Headquarters Tenant Improvements

Renovation of an existing 213,400 s.f. facility, including the construction of a 21,000 s.f. mezzanine. Removal of existing roof in order to create a central park area, construction of electronics laboratories, engineering creative space, and corporate office functions.  

Farmers Insurance

New tenant improvement build-out in an existing 11-story, Class-A office building. The nine floors of renovation totaled 190,000 s.f., which was part of a headquarter relocation of 2,000 personnel from Simi Valley to Woodland Hills. The tenant improvements included executive private offices and conference rooms with architectural glass wall systems, core restroom upgrades, break rooms, galleys and […]

Edwards Lifesciences

The 23,500 s.f. interior office improvement involved installation of skylights and window openings; as well as, demolition, abatement and removal of 6,000 s.f. of manufacturing and testing facilities to create new offices, restrooms and break areas. The improvements included new cloud-type ceilings, glass partitions, new upgraded DDC controlled HVAC system, and installation of two 23-foot skylights. Site work included the renovation of […]

Capital Group

In an effort to better serve their clients and foster an internal culture of employee collaboration and appreciation, Capital Group was in need of a space refresh. Snyder Langston|Optym worked with Gensler to deliver a space that met these needs while keeping employee comfort within an occupied space a top priority. Snyder Langston managed the Design Build process to secure required payments […]