BMW Western Regional Training Center

BMW Western Regional Training Center

Located in Ontario, the BMW Western Regional Training Center consists of the expansion and construction of a one-story, 36,469 s.f. building equipped with a display area, training workshops, classrooms, body repair workshops, paint training units with paint booths, and a break room. The scope of work for the renovation of the existing building includes demolition […]

Ellie’s Table at The Boardwalk

Ellie’s Table is located at The Boardwalk, a cutting-edge office space in Irvine, CA. Our Optym team (Special Projects) completed this 2,000 s.f. cafe, which included the buildout of a new kitchen with remote storage, finishes throughout the public space, drop ceiling, sales counter and display cases with work counters.

Irvine Spectrum Center Courtyards

The scope of work includes the removal of the existing carousel, the installation of a new fog foundation system, new umbrellas, landscaping, landscape lighting, paver rework, and storm drain extensions.

725 Campus Square West/Moose Toys

commercial office construction

Core & Shell: This project in El Segundo involved the construction of a 344-stall short span parking garage on grade and two 2-story office core and shell buildings totaling 22,667 s.f. The scope of work also included common site area hardscape and landscape improvements.   Tenant Improvement: Occupied by Moose Toys, an Australian toy manufacturer, […]

Autogravity

This project consisted of a tenant improvement on the first and second floor of a four-story building at the Sand Canyon Business Center. The scope of work included partial demolition, wall framing, flooring, glass walls, MEP, low voltage, and a slide between floors.

USC Fitness Center Tenant Improvement

Located at Jefferson Boulevard and McClintock Avenue, this project is directly across the street from the School of Dentistry. The tenant build out consisted of the new 30,000 sf USC Village fitness facility inside Building 6. The scope of work included demolition, concrete, misc. steel, drywall, painting, tile, waterproofing, sound insulation, misc. floor finishes, mechanical, electrical, […]

Continental 2171 Rosecrans

This project consisted of demolishing an existing restaurant, landscaping, and site facilities. The scope of work included the construction of three new buildings for future retail tenants with new landscaping, patios, and site improvements. The new buildings feature high-end exterior finishes with Equitone and stainless steel paneling, aluminum windows and opening, enclosed patios with aluminum […]

Irvine Retail Center

This project consists of an ADA hardscape reconstruction and parking lot improvement reconfiguration. The exterior façade renovation at Smart & Final and Jenny Craig includes partial demolition of existing exterior finishes, column, storefronts and fabric awnings. Snyder Langston proposed exterior finishes and storefronts with lighting throughout center.

Hines Intersect

This project consists of a 3-building remodel. The scope of work for both Buildings A and B includes renovations at the Entry Portal Areas, Restrooms, Lobby and Levels 1 and 2 of the Basement, as well as the installation of Cantilevered Canopy Systems with Translucent Panels. Building C’s renovations includes the Level 1 Lobby, Conference […]

Executive Office Space

This project consisted of a 10,000 sf tenant improvement on the 4th floor of an occupied building. The scope of work included demo, wall framing, wood flooring, steel-framed glass wall system, natural wood cabinetry, and design-build MEP’s. This project moved extremely fast, progressing from framed walls to completion within 30 days.