Ground-up construction of the 10-story, 250,000 s.f. home to the Riverside County District Attorney. This project also features a three-level, 370,776 s.f., 331-stall subterranean parking structure. The project was completed in 21 months from time of mobilization to Certificate of Occupancy.
The building is a structural steel frame with structural lightweight concrete decks. The skin is precast and travertine with punch window glazing. The mechanical system is a cooling tower with fan rooms on each floor. Scope of work included a full tenant build-out for the District Attorney of Riverside County California.