- Voluntary Seismic upgrade of Building 2 East Wing
- Structural additions to mitigate deflection incompatibility and torsion irregularity deficiencies identified in the SB-1953 Seismic Evaluation
- Scope included strengthening concrete shear walls, columns, and deck with concrete and rebar enlargements, steel drag struts, steel column brackets, and FRP column wraps