Renovation and repositioning of a 110,000 s.f. warehouse facility into an integrated facility for manufacturing and warehousing of biomedical products. The project features Class 100,000 and 10,000 clean rooms with a chilled water and condenser water system for the injection molding equipment; a separate chilled water system dedicated to the clean area air conditioning system, three overhead rolling bridge cranes, compressed air, industrial, process and lab vacuum systems. Scope also included new research and test laboratories, significant seismic strengthening and hazardous materials abatement.