Client
LNR Property Corporation
Size
90,000 s.f. – Building A
185,795 g.s.f. – Building B
185,795 g.s.f. – Building C
Completion
Phase I – III: December 2001 – January 2004
Phase IV – Early 2005
Services Provided
• Pre-Construction Services
• General Contracting
Project Summary
Since January 2000, Snyder Langston has been on site constructing this marquee project unique in the San Fernando Valley. LNR Warner Center consists of seven mid-rise buildings encompassing 1.4 million gross square feet of office space and three parking garages accommodating 4,000 vehicles. To date, Snyder Langston has completed the following:
Phases IA & IB – Building C is a five-story, 185,795 g.s.f., Class A office building of steel and pre-cast concrete. This phase also included a five-level, 1,200-stall parking structure. Building B is a five-story, 185,795 g.s.f., Class A office building of steel and pre-cast concrete. Between the two buildings, nine floors where devoted to one tenant for an improvement build-out. This portion of the site also features a large plaza for corporate and community events.
Phase II – Building A is a three-story, 90,000 s.f. office building that had three tenant improvement projects. The project also included of a new private street with infrastructure and utilities.
Phase III – Two five-story Class A office buildings and a five-level, 1,300-stall parking structure. Building G is 187,510 s.f. and Building H is 187,000 s.f. The construction is a cast-in-place concrete slab over a foundation of grade beams on pre-cast concrete friction piles. The structure is a steel bolted moment frame with concrete-over-metal decks and the building skin is thin-shell, pre-cast, and glass curtainwall.
Phase IV – Two six-story, Class A office buildings—Buildings D and E—and a five-level, 1,500-stall parking structure.
The tenant improvement projects for these buildings included the following:
HealthNet
As part of Phases IA and IB, Snyder Langston provided construction services for HealthNet’s regional corporate headquarters tenant improvement totaling 334,000 s.f. Special project features included a 5,000 s.f. main communications facility with uninterrupted power supply, inert gas-fire suppression system, a 1,000 KW back-up power generator; and an added hydraulic elevator for freight.
Bremer & Whyte
As part of Phase IB, a 7,000 s.f. tenant improvement in Building B.
Univision Music Group
As part of Phase II, a 32,000 s.f. tenant improvement in Building A.
Wachovia Securities
As part of Phase II, a 29,000 s.f. tenant improvement in Building A.
CNA Insurance Company
As part of Phase II, a 12,000 s.f. tenant improvement in Building A.
ATK Missile Systems Company, LLC
A 75,000 s.f. tenant improvement.